Corme港口翻修/ACXT景观事务所
发布于:
Renovation of Corme’s Port by ACXT
设计方:ACXT景观事务所
位置:西班牙
竣工:2003年
分类:滨水
内容:实景照片
图片:24张
摄影师:ACXT

建筑面积:8835平方米
Area: 8,835 m2
这个场地部分由重要的元素定义,如码头,采石场,港口平台及周围景观等。码头是一个主导性的元素,由石头和混凝土定义,长度达到400米,从岩石中生出,高度从一米到五米不等,形成一个遮挡型的海港墙壁。设计解决了景观,海洋和村镇之间的过渡,一个墙壁的开发如同是对码头的复制,它被认为是场地内的基础设施。这个墙壁组织空间布局,将港口的公共空间包围,形成一个广场似的独特视野,一个可以欣赏周围海景的美好景点。设计中包含的雕塑是对水手的致敬,它们充满希望,望着远处的海洋。
The site is characterized spatially by significant elements such as the pier, the quarry, the harbor platform and the surrounding landscape. The pier is a preponderant element formed by a stone and concrete breakwater 400 meters long, starting out from the rock itself and varying in height from one meter to five meters at its furthest end, forming the sheltering harbor wall. The proposal resolves the transition space between the landscape, the sea and the village of Corme, with the development of a wall that replicates the pier, and is conceived as an infrastructure of the territory. This wall organizes the layout, enclosing and defining the public area of the harbor, creating a plaza-cum-vantage point, a privileged spot from where to enjoy the surrounding sea, rock and trees. The sculpture, a monument to the valiant seaman, resolutely gazing out to sea with hope and yearning.

Corme港口翻修-2

Corme港口翻修-3

Corme港口翻修-4

Corme港口翻修-5

Corme港口翻修-6

Corme港口翻修-7

Corme港口翻修-8

Corme港口翻修-9

Corme港口翻修-10

Corme港口翻修-11

Corme港口翻修-12

Corme港口翻修-13

Corme港口翻修-14

Corme港口翻修-15

Corme港口翻修-16
本文来源网络,版权归原作者所有,如有侵权请联系删除