舍尔体育馆/LAN Architecture
发布于:
Gymnasium and Town Hall Esplanade
设计方:LAN Architecture
位置:法国 舍尔
竣工:2012年
分类:体育建筑
内容:实景照片
图片:41张
摄影师:Julien Lanoo

造价: 385万欧元
建筑面积: 2200 平方米
这座体育馆和舍尔市民中心步行街的设计是一个解决以在前建设中遗留问题的好机会。用地的位置非常特殊,位于各种城市元素交汇的中心,宗教、行政、文化、教育和体育等功能都集中在这片区域。设计师对建筑细部、空间逻辑和各元素之间的平衡进行了分析,将这次设计视为城市的结构重组,而体育馆和市民广场是其中连接其他各个空间的结点。建筑的轮廓是长方形,与周围的高中学校和市政厅平行,更好的定义了城市空间,并将公园与教堂联系起来。广场和新步行街这些公共空间,周边都由建筑来界定范围,回归了传统的城市空间逻辑。这座体育馆的表皮由两层构成,一层是玻璃幕墙,让光线穿透或反射,第二层是铜板,使建筑更富于色彩,并且增加了玻璃的镜面反射效果。在室内,铜板还对玻璃幕墙起到了保护作用。简单的形式、方正的平面更易于空间功能排布,特殊的表皮弱化了建筑的存在感,留给人们的整体印象是轻盈而富有魔力的,而在夜晚,则与白天的感受正相反,这个发光的盒子将成为这片区域的主导景观。
The design of the gymnasium and the square of central Chelles was an opportunity to use an architectural project to address urban issues that have been left aside in past developments. The plot is indeed in a central position between the Park of Remembrance Emile Fouchard, the town hall, the Weczerka high school and the centre for contemporary art «les églises»: a highly heterogeneous environment where all the symbols and powers of the city (the church, State, culture, education and sports) are concentrated.Based on this observation, we considered the project as an operation of urban reassembly in which the gym and esplanade play the role of articulation. We relied on a detailed analysis of the operation, sequences and the scales of the various components. The orthogonal footprint of the building is parallel to the facades of the high school and the town hall. In this way, it helps to redefine and enhance urban spaces as well as to connect the park to the church through a journey.These public spaces, the piazza and the new pedestrian street, are drawn in a conventional manner: regular, surrounded and defined by buildings.To this end, the facade is composed of two layers, the first (the glass) reflecting and letting in light, and the second (the copper), coloring and magnifying the reflection, providing protection from glass impacts.While the simple shape and the orthogonal location of the building allows to order spaces, the facades create an ambiguity emptying the building of its materiality, making it disappear. The whole gives an impression of lightness and magic. At night, the game is reversed.Outside, the rainwater recovery system works together with the green roof. It supplies the gymnasium’s sanitary areas and the surrounding greenery.

舍尔体育馆-2

舍尔体育馆-3

舍尔体育馆-4

舍尔体育馆-5

舍尔体育馆-6

舍尔体育馆-7

舍尔体育馆-8

舍尔体育馆-9

舍尔体育馆-10

舍尔体育馆-11

舍尔体育馆-12

舍尔体育馆-13

舍尔体育馆-14

舍尔体育馆-15

舍尔体育馆-16

舍尔体育馆-17

舍尔体育馆-18

舍尔体育馆-19

舍尔体育馆-20

舍尔体育馆-21

舍尔体育馆-22

舍尔体育馆-23

舍尔体育馆-24

舍尔体育馆-25

舍尔体育馆-26

舍尔体育馆-27

舍尔体育馆-28

舍尔体育馆-29

舍尔体育馆-30

舍尔体育馆-31

舍尔体育馆-32

舍尔体育馆-33

舍尔体育馆-34

舍尔体育馆-35

舍尔体育馆-36

舍尔体育馆-37

舍尔体育馆-38

舍尔体育馆-39

舍尔体育馆-40

舍尔体育馆-41








































本文来源网络,版权归原作者所有,如有侵权请联系删除