建筑学长
当前位置:案例 > 建筑 > 体育建筑 > 正文

法国蒙蒂尼莱梅特市水上运动中心/DRD Architecture

发布于:

French monti, Bremen, water sports centre

设计方:DRD Architecture

位置:法国 蒙蒂尼莱梅特市

分类:体育建筑

内容:实景照片

合作人:Agence Mohoric

成本:7.2 M € hqe

图片:9张



这是由DRD Architecture设计的法国蒙蒂尼莱梅特市水上运动中心。蒂尼莱梅特市在可持续发展和遗址保育的背景下,决定改造并扩展游泳池。这个综合体结合了一个公共大厅、泳池及公共区、地区办公室、门卫保安室及楼上的餐饮学校。蒂尼莱梅特市游泳池为建筑师Jean Bigard,建于1969年,包括运动泳池、跳水池和嬉戏池。在2011年,它在技术、卫生以及可达性方面已经不能满足其使用需求。建筑师对原建筑进行部分拆卸,包括与公共接待相关的功能区(接待处、更衣室、教员室及室外游泳池),保留大厅基本元素,以形成强烈的建筑辨识度和集体记忆。

译者: 艾比

From the architect. In these times of sustainable development and fostering heritage, the city of Montigny-lès-Metz, decided to rehabilitate and extend the pool, located at 19 rue Pierre de Coubertin. It was a complex combining around of a common lobby, pool and public areas, an area associative offices, apartment keeper and upstairs restaurant school.

This building was installed bracket along the public domain in the North East and South. Is bordering the square Pierre de Coubertin and opened to South West on a large tile occupied by a sports pool 50×20 meters, a diving pool of 12,5×12,5 meters and a pond playful 10×12,5 meter itself light overlooking a large space leafy green. The pool of Montigny-lès-Metz was designed by the architect Jean Bigard in 1969.

In 2011, it was no longer possible to satisfy the requirements that demand a nautical center at the technique level, and in terms of hygiene and Accessibility. Our project involved the partial demolition of the existing, that is to say, all the places dedicated to the public reception (reception, changing rooms, staff rooms and outdoor pools) in order to keep the hall basins in addition of being an element that represents the memory as an element for a strong architectural identity.

Our project is a continuation of what was created by Jean Bigard, a hall of monumental basins treated in length and close from the plot. The majority of new buildings shows the location of the existing buildings demolished. Only the lobby and local personnel are added to the front parking lot side. These premises are the same size as those demolished, playing politeness and discretion, saying the emergence of the retained hall. Only a few roofs movements are marked by oblique vegetated, elements that signal and call.

The sheltered courtyard, is itself centered on the complex, and gives to it a strong signal to identify at a glance the main entrance: a portico sheltered from the forecourt to the entrance of the school allows both to provide a sheltered waiting area, but also to create buffer with locker rooms, a patio here used to filter views from the parking lot. The project offers an outdoor 10×20 meters’ pool in stainless steel taking place in a part of the grip of the former 50-meter pool.

The latter of which, still the imprint device with a set of benches treated rough concrete, harmonizes with the colors of the outer beaches concrete acid. Disbursed in the slab are treated planted planters of different grass species and medium stemmed trees. On the diving pool recapped, took a set of umbrellas at different heights in thermally treated wood, treated pergola around a core structure and wood siding, natural tone in which are arranged the bar and its reserve. Gaming stretched canvas, in some of these pergolas, allow to take shelter from the rain. The training pool is transformed into open-air theater by recharge concrete and wood cladding. It is used for animations in attendance, for outdoor centers or solarium terraces by the public.



法国蒙蒂尼莱梅特市水上运动中心外部实景图



法国蒙蒂尼莱梅特市水上运动中心外部实景图



法国蒙蒂尼莱梅特市水上运动中心外部实景图



法国蒙蒂尼莱梅特市水上运动中心内部实景图



法国蒙蒂尼莱梅特市水上运动中心内部局部实景图



法国蒙蒂尼莱梅特市水上运动中心内部局部实景图



法国蒙蒂尼莱梅特市水上运动中心平面图



法国蒙蒂尼莱梅特市水上运动中心剖面图



法国蒙蒂尼莱梅特市水上运动中心外部实景图



法国蒙蒂尼莱梅特市水上运动中心外部实景图



法国蒙蒂尼莱梅特市水上运动中心外部实景图



法国蒙蒂尼莱梅特市水上运动中心内部实景图



法国蒙蒂尼莱梅特市水上运动中心内部局部实景图



法国蒙蒂尼莱梅特市水上运动中心内部局部实景图



法国蒙蒂尼莱梅特市水上运动中心平面图



法国蒙蒂尼莱梅特市水上运动中心剖面图

本文来源网络,版权归原作者所有,如有侵权请联系删除