建筑学长
当前位置:案例 > 建筑 > 娱乐建筑 > 正文

Panoramabad浴场/KREINERarchitektur建筑事务所

发布于:

Panoramabad Gröbming

设计方:KREINERarchitektur建筑事务所

位置:奥地利 Gröbming

竣工:2010年

分类:娱乐建筑

内容:实景照片

图片:19张



摄影师:Courtesy of KREINERarchitektur


这个项目的设计考虑到包括地理环境,太阳角度,视角,既有建筑等等元素。已有的泳池位于山边,与周围的山体有着紧密的视觉联系,为了进一步最大限度地发挥这种地理位置的优势及抓住太阳的照射,倾斜的坡体被完全覆盖以形成建筑。建筑因此与既有建筑完美融合,同时呈现出一个尖尖的屋顶。

When designing the new family bath in Gröbming the entire environment in terms of topography, sun history, perspectives, and existing buildings were analyzed. The existing pool area is located on a hillside and has great visual links to the surrounding mountain peaks. To optimally exploit this situation and capture the sun’s rays, the sloping terrain will be completed by the placement of the building. The building blends seamlessly with the existing buildings and was provided with a pitched roof.



Panoramabad浴场-2



Panoramabad浴场-3



Panoramabad浴场-4



Panoramabad浴场-5



Panoramabad浴场-6



Panoramabad浴场-7



Panoramabad浴场-8



Panoramabad浴场-9



Panoramabad浴场-10



Panoramabad浴场-11



Panoramabad浴场-12



Panoramabad浴场-13



Panoramabad浴场-14



立面图01 Elevations01



立面图02 Elevations02



立面图03 Elevations03



平面图 Plan



剖面图 Section

本文来源网络,版权归原作者所有,如有侵权请联系删除