塞维利亚新建小学及托儿所/不详
发布于:
New Public Nursery and Primary School in Seville
位置:西班牙
分类:教育建筑
内容:实景照片
图片:20张

建筑设计:UNIA Arquitectos
建筑时间:2013
图片来源:Fernando Alda
这是UNIA Arquitectos设计的塞维利亚新建小学及托儿所。场地标高41.9米,主入口设于建筑北边,标高为41.5米。考虑到建筑主要使用者为低年龄的小朋友,建筑设计师不打算设计复杂的高差。
场地东边,建筑将适当退界,以让出一些林木空间。而标高42.4米的场地南边,规划作为学校未来发展预留空间。建筑紧凑布置,贯穿其中的中庭绿化空间提供了交流、集会的场所,并增加室内光线。主入口大厅位于建筑北部。托儿所位于建筑东翼。行政管理区以及后勤区集中布置在建筑首层。所有小学课室布置在二层。建筑内设有三个垂直交通通道。主要的楼梯以及电梯布置在主入口大厅,另外两个直跑楼梯可直接通向球场。主体建筑与体育馆、食堂相连。建筑为钢架结构。
译者: 艾比
In order to resolve the implantation of the building on the site, we started setting the sports track with the right orientation. The track is placed on the level + 41,90 m, optimizing the topography modification works.The north side of the lot is located on the level + 41,50 m, where we find the entrance to the administration, the nursery and primary areas. Thus, we try to not create large differences from one level to the next, thinking in the short age of the users.
The volume is setback from the east border of the lot and the resulting outer space is landscaping with medium size trees. In the other hand, the southern area of the plot is situated on the level +42,40 m and released from building, with an reserved area for the future expansion of the school.
The building operates as a large and compact container perforated by a central yard, which becomes an element that communicates, organizes and lights up the interiors.The entrance hall is situated in the northern part of the building, from where the program is developed in several packages.The nursery school is located in the east wing of the school within a large linear piece that covers the plot from the North to the South.The areas for the administration and the complementary uses close the program of needs on the ground floor. All the primary classrooms are located on the first floor. Three vertical cores resolve communication between both floors. The main staircase and the integrated lift are situated in the entrance hall. Other two linear staircases are located crossing the central court as bridges.
The main volume is connected to another piece which contains the gym and the restaurant.These rooms are both supported by a metallic structure without intermediate pillars.

塞维利亚新建小学及托儿所外观局部图

塞维利亚新建小学及托儿所外观局部图

塞维利亚新建小学及托儿所外观局部图

塞维利亚新建小学及托儿所外观局部图

塞维利亚新建小学及托儿所

塞维利亚新建小学及托儿所

塞维利亚新建小学及托儿所

塞维利亚新建小学及托儿所

塞维利亚新建小学及托儿所

塞维利亚新建小学及托儿所

塞维利亚新建小学及托儿所

塞维利亚新建小学及托儿所

塞维利亚新建小学及托儿所

塞维利亚新建小学及托儿所

塞维利亚新建小学及托儿所

塞维利亚新建小学及托儿所

塞维利亚新建小学及托儿所

塞维利亚新建小学及托儿所

塞维利亚新建小学及托儿所
本文来源网络,版权归原作者所有,如有侵权请联系删除